I want to configure 2 tasks which should trigger from windows scheduler (windows server 2012) first task will be scheduled daily and second one should be scheduled at every 15 days and second oen should be start only if first task completed (event #102). Windows Scheduler task with Multiple triggers configurations.
0 Comments
Leave a Reply. |